Onsite or In-Situ Lining.

  • Mobile equiptment.

  • New and existing pipelines.

  • Up to 1300m of pipe lined in one hour.

The mobility of the equipment used in this process means that lining of existing or new pipelines is not limited to the workshop. The scale of onsite lining that can take place was demonstrated in the construction of the 304km underground pipeline (300 NB) carrying zinc concentrate which was internally lined and installed onsite by PIHA for the Pasminco Century Mine in North-West Queensland.
 
This pipeline had an operating pressure of 20,000 kPa.
 
Using this technique pipes with internal diameter between 25mm and 1200mm can be lined to maximum section lengths of 1300 metres – depending on the terrain, diameter, condition of the steel and bends.
 
PIHA own and operate an extensive array of specialist pipeline and lining plant equipment which allows us to customise all projects undertaken to your exact needs and specifications. If you believe that a PIHA lining system could benefit your project or would like further information please contact us at our Bibra Lake office.

Home   |   About Us   |   What we Do   |   Safety   |   Employment   |   Photo Gallery   |   Contact Us